Hon. O. B. Amoah (MP) and the MCE, Hon Frank Aidoo together with the Municipal Education Director, Chiefs, Opinion Leaders, the Assemblyman, Clergymen of the Methodist Church and teachers commissioned a 1-unit 6-unit classroom block with ancillary facility at Aburi Kemp on the 20th October, 2024.
The construction of the facility which was executed by Meshaus Construction Ltd was started on the 26th November, 2020 and completed in August, 2024 with funding from the District Assembly Common Fund (DACF).
Hon. Frank Aidoo admonished the students to make good use of the facility by way of maximizing its use thereby reciprocating in good grades to make their parents and the municipality proud.
The Education Director thanked the Assembly for the project and vowed to make good use of the facility. The keys to the classroom blocks were handed over to the Education Director signifying its readiness for use by students and teachers for effective learning.
6-Unit Classroom Block Commissioning at Aburi-Kemp
The construction of the facility which was executed by Meshaus Construction Ltd was started on the 26th November, 2020 and completed in August, 2024 with funding from the District Assembly Common Fund (DACF).
Hon. Frank Aidoo admonished the students to make good use of the facility by way of maximizing its use thereby reciprocating in good grades to make their parents and the municipality proud.
The Education Director thanked the Assembly for the project and vowed to make good use of the facility. The keys to the classroom blocks were handed over to the Education Director signifying its readiness for use by students and teachers for effective learning.
Below are picture of the commissioning:
Leave a comment